Production planning for a meal-plan kitchen

Production planning here is unusually tractable, because unlike a restaurant you know your entire day before it starts. The difficulty is not forecasting — it is keeping the plan in step with a customer base that keeps changing its mind.

Derive the counts, never type them

The production sheet should be a view of customer selections, not a document someone maintains. The moment it is typed, it becomes a second source of truth that has to be reconciled with the first — and reconciliation is exactly the work you were trying to eliminate.

The test is simple: when a customer changes a meal, does the production number change by itself? If someone has to remember to update it, the sheet will be wrong on the day it matters most.

Two views of the same day

The kitchen and the packing bench need opposite shapes of the same data.

  • Aggregate, for cooking

    Total portions per recipe, summed across every customer, so the line has one number to work to.

  • Individual, for packing

    Which portion belongs to which named customer, with their allergens attached, so the right box reaches the right person.

  • Exceptions, for both

    Allergen conflicts and unusual requirements surfaced before service rather than discovered mid-shift.

Plan to the cut-off, not to the week

Planning production for days whose selections are still open produces confident numbers that are wrong. The useful planning horizon ends at the cut-off; beyond it you are estimating, and estimates should be labelled as such.

This is why cut-off and production planning are really one topic. Move the cut-off and you move the horizon over which your plan is trustworthy.

Common questions

How far ahead should production be planned?
Firmly, only as far as the cut-off — beyond that, customer selections can still change. Anything further out should be treated as an estimate for purchasing purposes rather than a plan the kitchen works to.
Should the kitchen see customer names?
For cooking, no: aggregate counts are the right view and names are noise. For packing and allergen checks, yes, because those tasks are about a specific portion belonging to a specific person.
What causes a production sheet to drift from reality?
Almost always a mid-week change that was applied in one place and not another. If the sheet is derived from selections rather than maintained by hand, that class of drift cannot happen.

See how this works in practice

The home page walks through the same mechanics against a real admin loaded with a demonstration kitchen: production, packing, routes and the customer side.