The risk in this migration is not data loss. It is the week where half the operation is in one system and half in another, and nobody is certain which is authoritative.

An order that limits the damage

Move the things that must not disagree first, and switch them cleanly rather than gradually.

  1. Customers, plans and allergens

    One authoritative record of who is on what, with dietary needs structured and a precise address. Everything downstream derives from this.

  2. Weekly selections

    The other half of the source of truth. Once this and the customer record are in one place, derivation becomes possible at all.

  3. Production and purchasing

    Now generated rather than maintained. This is where the daily time saving actually appears, and where confidence is won.

  4. Labels and delivery

    Derived from the same selections, so the box, the label and the stop cannot disagree.

  5. Reporting last

    Once the operational data is trustworthy, reporting is a view rather than a reconciliation exercise.

Do not run both for long

A parallel period feels prudent and is the main source of implementation pain. Two systems holding the same customer facts means two versions of Tuesday, and staff will trust whichever one was right last time.

Pick a cut-over week, ideally a quiet one, and switch the source of truth in a single step. Keep the old spreadsheet readable for reference, but stop writing to it entirely on that date.

What usually goes wrong

Addresses and allergens. Both are typically held as free text, and both need structure to be useful, so migration means cleaning rather than copying. Budget real time for it and do it before the cut-over rather than during.

The second surprise is cut-off enforcement. If the rule has been flexible in practice, the first week of consistent enforcement generates customer conversations. Warn people in advance and it is a non-event.

Common questions

How long should a parallel run last?
As short as possible, ideally not at all. Two systems holding the same customer facts produce two versions of the same day, and staff will trust whichever was right most recently.
What is hardest to migrate?
Addresses and allergens, because both are usually free text and both need structure to be useful. That is a cleaning exercise rather than a copy, and it should happen before cut-over.
When is the best time to switch?
A quiet week, with the cut-off rule communicated to customers in advance. The first week of consistent enforcement is otherwise mistaken for the software being inflexible.